GSB31

From: £6,310.82

Clear

*Indicates required fields

Main Building

Length = 7 metres
Width = 3 metres
Eave Height = 2.4 metres
Roof Pitch = 15 degrees
Number of Bays = 2
Bay Size = 3.5 metres

Cladding and Rain Water

Single SkinInsulated
Wall CladdingAS24 1000W Posco 0.5 Wall Claddingn/a
Roof CladdingAS30 1000R Posco 0.7 Roof Claddingn/a
Skylights4n/a
Anti Condensation Barrierincludedn/a
Gutter TypeGutter Plastisoln/a
Down Pipe TypeDownpipe 75 x 75 Poscon/a
Ridge Fillersincludedn/a
Eave Fillersincludedn/a
Base Fillersincludedn/a

Colours

Roof Colour = Posco Olive Green

Wall Colour = Posco Olive Green

Barge Colour = Plastisol Moorland Green

Gutter Colour = Plastisol Moorland Green

Corner Flashing Colour = Plastisol Moorland Green

Ridge Cap Colour = Posco Moorland Green

Opening Flashing Colour = Plastisol Moorland Green

Skylight Colour = Clear

Roller Doors

2 X 2.49m wide by 2.135m high Merlin Grey Grey roller door, (Daylight Opening is 2.44m wide x 1.935m Height)

Additional Costs You May Incur:-

  • Site Survey, within a 35-mile radius, from £40 – £120 + VAT (will be refunded if an order is placed)
  • Calculations for Standard Structural Design: £300 + VAT
  • Non-standard structures of any value will be Price on Application
  • SER certification is not available.
  • Design of Non-Standard Foundations and Structures at any value will be priced on Application
  • All electrical work involving roller shutter doors
  • Delivery out with the mainland

Payment Terms: – 

  • Deposit — 50% plus VAT of kit price on ordering kit (All deposits are non-refundable) bacs, debit / credit card or cheque.
  • Balance payable by bacs, internet banking, debit / credit card or cheque. (5 working days before factory dispatch date). The cheque must arrive five working days before the factory dispatch date. Due to factory terms, failure to make this payment will incur £250 storage /handling charge and your order will be held until the balance is paid along with accrued storage charges. The next available delivery time will be advised.

Notes: –

  • Delivery is to front of property only unless there is sufficient area for the delivery truck to turn around on your property.
  • Said Kit remains the property of the supplier until fully paid for.
  • The purchaser agrees to accept the said kit within four weeks of Ordering.
  • In the event of a material price rise by the material manufacturer the purchaser agrees to pay the increase.